Planning priorities
Planning should separate emergency access, accessible parking, visitor peaks and staff demand. Redundant equipment paths and lifecycle support reduce operational risk.
Site inputsSurvey, footprint, levels and structure
Operating inputsCapacity, vehicle mix and peak demand
System inputsEntry cabins, movement path and redundancy
Delivery inputsCodes, interfaces, schedule and service
Frequently asked questions
What information is needed for an initial concept?
Location, target capacity, site or building drawings, vehicle mix, peak demand and project schedule.
Can the system be customized?
Configuration depends on site geometry, operating targets, applicable codes and verified equipment limits.