Planning priorities
Tower systems prioritize vertical density and automated storage; puzzle systems provide practical capacity through platform lifting and sliding. Confirm footprint, headroom, pits, queue expectations and operating model.
Site inputsSurvey, footprint, levels and structure
Operating inputsCapacity, vehicle mix and peak demand
System inputsEntry cabins, movement path and redundancy
Delivery inputsCodes, interfaces, schedule and service
Frequently asked questions
What information is needed for an initial concept?
Location, target capacity, site or building drawings, vehicle mix, peak demand and project schedule.
Can the system be customized?
Configuration depends on site geometry, operating targets, applicable codes and verified equipment limits.